top of page
< Back

First-in-India VMS Deployment at a 765kV Switchyard

Client:
Location:
Commissioned:
Application:
Technology:

POWERGRID (Power Grid Corporation of India)

First-in-India VMS at a 765kV Switchyard | POWERGRID Seoni | Sam Infotech

Project Overview:

First-in-India VMS deployment at a 765kV EHV switchyard for POWERGRID, in Seoni, Madhya Pradesh.

Project Scope:

Design and integration of a Video Management System (VMS) with CCTV coverage across an 800kV EHV switchyard.

Engineering Challenge:

765kV switchyards involve extreme electromagnetic interference, strict safety clearances, and zero tolerance for surveillance downtime, ruling out standard commercial CCTV/VMS deployments.

Solution:

Sam Infotech engineered and commissioned a VMS-integrated CCTV system specifically hardened for EHV switchyard conditions, coordinating installation around live high-voltage equipment and safety protocols.

Outcome:

The first VMS installation of its kind at a 765kV switchyard in India, since referenced internally as a template for subsequent POWERGRID surveillance projects.

Copyright © Sam Infotech. All Rights Reserved.

bottom of page