First-in-India VMS Deployment at a 765kV Switchyard
Client:
Location:
Commissioned:
Application:
Technology:
POWERGRID (Power Grid Corporation of India)
Project Overview:
First-in-India VMS deployment at a 765kV EHV switchyard for POWERGRID, in Seoni, Madhya Pradesh.
Project Scope:
Design and integration of a Video Management System (VMS) with CCTV coverage across an 800kV EHV switchyard.
Engineering Challenge:
765kV switchyards involve extreme electromagnetic interference, strict safety clearances, and zero tolerance for surveillance downtime, ruling out standard commercial CCTV/VMS deployments.
Solution:
Sam Infotech engineered and commissioned a VMS-integrated CCTV system specifically hardened for EHV switchyard conditions, coordinating installation around live high-voltage equipment and safety protocols.
Outcome:
The first VMS installation of its kind at a 765kV switchyard in India, since referenced internally as a template for subsequent POWERGRID surveillance projects.
